The Longworth Elevator Construction

Report #3, October 7th:
Earth Removal & Barriers

A series of steel and wood barrier walls are being installed around the support beams and along the perimeter walls.

Removal of earth and concrete, continues.

The area where a footer is now installed-->

 

 

Planks used for barrier construction.

..............
Debris placed in a discard area will be removed through the roof.

The upper level perimeter: the earth is carefully narrowed closer to the wall.

Some of the perimeter areas are reduced by hand.

View of debris cut by welder.

 

Longworth Construction Site seen from the back of room to the front.

This is Report #3, October 7, 1996